This course DCC3113 provides the students with the knowledge regarding the method and design involved in traffic engineering. This course emphasizes on introduction to highway and traffic, transportation planning, pavement materials, construction of flexible pavement, construction of rigid pavement, traffic control equipment and road furniture, flexible pavement design, junction design, traffic management and highway maintenance.
Tuesday, 16 July 2019
Monday, 15 July 2019
Highway Road Pavement
The layer of flexible road pavement
Here we are presenting about the flexible pavement road
This is the second layer - Soil
This is the third layer - Fine aggregate/Sand
Aktiviti hari khamis 11/7/2019
AKTIVITI KAMI PADA HARI KHAMIS-(11/7/2019)
![]() |
| *Pada hari khamis , kami mulakan kelas dengan aktiviti mengenal pasti faktor , punca dan cara mengatasi sebuah kemalangan daripada artikel kemalangan yang kami cari di internet |
AKTIVITI KE-2
![]() |
| *Bagi setiap saiz agregat yang telah diayak, kami mengukur setiap panjang agregat pada "elongation gauge" |
*Kami membuat video berkenaan pengenalan kepada bahan asas pembinaan jalan raya iaitu:-
*soil (tanah)
*fine aggregate (pasir)
*coarse aggregate (batu baur kasar)
*bitumen / tar
News about accidents
Pada hari khamis yang lalu kami telah membuat kajian tentang kemalangan jalan raya yang berlaku di Malaysia pada baru-baru ini .
https://docs.google.com/presentation/d/1-ZWIBU_yXCqrxhQFZlOTK03cu08aHg4C-TH6hTv9y9A
slide Group 6 , presentation about highway
slide Group 6 , presentation about highway
Road Pavement
The videos we post is about the road pavement layers.The first layer of road construction is Subgrade.The second is Subbase.The third layer is Base and then the last layer is Surface.
At Thursday , 11 july we were present about material highway . we learn some new knowledge about pavement . Pavement have 4 layer . The first layer is subgrade that we use top soil . The second layer subase course that use fine aggregate , the third layer base course that we use course aggregate and the last one surface we use bitumen .
Pavement Material
Hi and greetings everyone, it is us group 4 presenting about pavement material.
(11/7/2019 Thursday ) Thank for al-watching :)😜
This group were presented about the materials used in Highway. We learnt that there are few layers before the highways were made. The first layer of the highway is Subgrade, the second layer is sub base & the third one is base. We also learnt that different layer were used with different types of materials. For subgrade, we use Soil. Secondly, for the sub base we use fine aggregate. Lastly, we use coarse aggregate for the base. With the help of our lecturer, Encik SaifulBahri, we gained new knowledge of this topic which is the constructions of highways.
Today 11/7/2019, we learn about Road Pavement and Road Accident.
There is 5layer of Road Pavement.
The first layer is Top soil, the 2nd is Subgrade layer, 3rd is Subbase layer, 4th is Base course and the 5th is Surface layer.
We also learn about Road accident which every road accident have it's causes,factor and solution.
Material for Subgrade layer